EcoReadyBath delivered 498 bathroom pods for The Social Hub Glasgow. The building combined hotel, student and co-living functions and required coordination across multiple zones and riser arrangements. A floorless pod solution was used to integrate with the structural slab and service strategy.
Scope of delivery
- Design and manufacture of 498 bathroom pods
- Multiple pod layouts for hotel, student and co-living units
- Floorless pod system integrated with the structural floor
- Coordination with single and double riser configurations
- BWIC interface management with the main contractor
Outcome.
- Repeatable bathroom standard across the full scheme
- Installation structured by building zone
- Clearer interface management on site