EcoReadyBath is supplying 292 bathroom pods for Staytion Kondor in Berlin. The project spans multiple buildings and a high number of repeated units, making standardisation and delivery sequence critical. Pods reduce site variability and create a uniform bathroom package across the development.
Scope of delivery
- Design, manufacture and delivery of 292 bathroom pods
- Pod layouts developed for residential apartments
- Integrated plumbing, electrical and ventilation systems
- Factory installation of sanitaryware and finishes
- Delivery model aligned with a multi-building programme
Outcome.
- Consistent bathroom quality across residential units
- Reduced bathroom fit-out on site
- Installation aligned with the build programme