EcoReadyBath delivered 194 bathroom pods for IntercityHotel Karlsruhe in Germany. The hotel formed part of a mixed-use urban development, requiring coordination between hotel functions and a wider building programme. Pods reduced site-based bathroom assembly and standardised delivery across all guest rooms.
Scope of delivery
- Design, manufacture and delivery of 194 bathroom pods
- Pod layouts developed for a four-star hotel standard
- Coordination with mixed-use building interfaces
- Factory-built pods with integrated sanitary and finishes
- Delivery aligned with the construction programme
Outcome.
- Consistent bathroom quality across hotel rooms
- Reduced bathroom fit-out on site
- Installation aligned with the wider build sequence