Skip to main content
← Back to projects
Residential

Brent Cross Town Plot 203 — Residential Development

London, United Kingdom · 2023
Pods delivered
172 bathroom units
Sector
Residential Project sector
Year
2023 delivery completed
Country
United Kingdom London
Installation
Just-in-time just-in-time installation

EcoReadyBath delivered 172 bathroom pods for Brent Cross Town Plot 203 in London. As part of a large urban residential programme, the project required a repeatable bathroom package coordinated across multiple apartment layouts and aligned with a structured construction sequence. The pods reduced internal trade overlap and standardised one of the most coordination-heavy scopes.

Scope of delivery

  • Design, manufacture and delivery of 172 bathroom pods
  • Pod solution developed for repeated residential layouts
  • Coordination of service interfaces and installation points
  • Factory-built pods with integrated internal systems
  • Just-in-time delivery aligned with the residential programme

Outcome.

  • Repeatable bathroom execution across apartments
  • Reduced internal fit-out work on site
  • Installation aligned with the wider build sequence
Project partners

Delivered for Brent Cross Town.

Planning a similar project?

Our team can walk you through scope, schedule and pod configuration for your residential.

Discuss your project