EcoReadyBath delivered 157 bathroom pods for Hilton Garden Inn Feldkirchen in Germany. The project required a repeatable bathroom package aligned with an international hotel brand standard and a clear installation sequence. Pods reduced site-based bathroom assembly and standardised execution across the hotel.
Scope of delivery
- Design, manufacture and delivery of 157 bathroom pods
- Pod layouts developed to Hilton Garden Inn standards
- Coordination of service interfaces and installation points
- Factory installation of sanitaryware, finishes and equipment
- Delivery aligned with the construction programme
Outcome.
- Consistent bathroom standard across guest rooms
- Reduced bathroom fit-out on site
- Installation aligned with the project sequence