EcoReadyBath delivered 303 bathroom pods for The Fizz Münster in Germany. The project involved a high number of repeated student units, making standardisation and installation sequence critical. Pods reduced on-site wet trades and supported a consistent bathroom package across the development.
Scope of delivery
- Design, manufacture and delivery of 303 bathroom pods
- Pod layouts developed for PBSA units
- Coordination of pod interfaces with repeated apartment layouts
- Factory-built pods with integrated internal systems
- Delivery aligned with the construction schedule
Outcome.
- Repeatable bathroom standard across student units
- Reduced bathroom work on site
- Installation sequenced with the main programme